Kitchen Makeover SeriesEpisode 1
The 48-Hour Kitchen Makeover in Lillington
Watch the full episode
- Town
- Lillington, NC
- Build
- 48-hour makeover
Travis and the My Kitchen Pros crews remodel a Lillington kitchen in 48 hours. The kitchen was built in 1995 with builder-grade cabinets and laminate, and the homeowners ask for more space, a brighter room, a way to get rid of the garbage can and a use for the hard-to-reach blind corner. The plan includes a 9-inch spice pull-out with three rows, Blue Valley Dove White cabinets paired with Shaker Gray, granite counters and a 2 by 8 Arctic White tile backsplash.
About six crews start on demo, plumbing and electrical, and the homeowners add new outlets to the job that morning. The build does not go smoothly. A gap beside a finished section is too big to hide with silicone, so the team makes a cardboard template and has a new piece cut at the fabrication shop. On the final morning, a cabinet run does not measure the way it was supposed to, with minutes left on the clock.
The backsplash changes from a brick lay to a herringbone pattern, the sink is upgraded to a zero radius model with accessories, a new dishwasher goes in, and outlets that were not wired to code are replaced. At the reveal the homeowners see the finished kitchen for the first time, and a local electrician who works with the team surprises them with LED under-cabinet lighting.
Length 28:24Watch on YouTube (opens in a new tab)
Clips from this episode
29 Minutes Left to Finish This Kitchen | 48-Hour Kitchen Makeover
Want Your Kitchen Done in 48 Hours? We're Picking the Next One
Will the New Faucet Even Fit? | 48-Hour Kitchen Makeover
One Gap Means Tearing Out a Finished Section | 48-Hour Kitchen Makeover
How We Handle the Dreaded Blind Corner Cabinet | 48-Hour Kitchen Makeover
Can a Full Kitchen Remodel Really Be Done in 48 Hours?
Video transcript
0:00First one.
0:00Oh my gosh.
0:03I might have to go to Home Depot.
0:06It was supposed to have a filler.
0:10Oh my god, that's not going to fit. Ace or a bear. Extreme 48-hour kitchen makeover edition. Let's go. Hey guys, it is a beautiful day in Lillington, North Carolina. We are super excited. We are doing a 48-hour extreme makeover kitchen edition. So, come follow along and let's go meet the homeowners and see what we have in store.
0:39How's it going?
0:40Good to see you. Absolutely. How you doing, sir?
0:45I'm so excited. I have been waiting this for a long time.
0:48Awesome. Well, let's get inside and let's see how we can help. All right, guys. So, what are we hoping to accomplish in here?
0:54This kitchen was built in 1995. And the cabinets and the laminate are builder grade.
1:02Yep, absolutely.
1:04And so, we need more space. I would like to get rid of the garbage can. I'd like to make the kitchen brighter. And of course, you know, look looking like a new kitchen. Well, I would really like to do something with the space over here. As you can see like there's a lot of space back there, but you can't get to it.
1:24The dreaded blind corner cabinet is what we call it. Usually a small door, you have to reach all the way back. You can't see what you're actually reaching for. Maybe doing a lazy Susan.
1:36Oh, that would be great.
1:37A diagonal wall corner to kind of match up top. What do you think?
1:42I would love that.
1:43Now, tell me, spices. Did you have a designated cabinet for it? And if so, was it in an upper cabinet?
1:50Yes.
1:51Okay. And so, all the spices were just stacked on top of each other?
1:55In here and here and you know, wherever I could cram them in.
1:59Okay. What if we did a spice rack pullout right here, 9 in? It'll pull out, it'll have three rows. You'll be able to easily put all your spices. You'll be able to see each spice, you'll be able to pick it up, grab it, and put it back. You won't have that clutteredness. It's just going to make things a lot better, easier to use. What do you.
2:18I think that would be awesome.
2:19Okay. So, you told me you wanted to update, you wanted to brighten up the space. I'm thinking maybe adding a little bit of color as well. So, what we have here is we have Blue Valley Cabinets Dove White. So, it's not the typical bright white. We paired it with their Shaker Gray as well. And then from there we went with MS International's Valley Nevada Granite. And then we're going to pair that with Delta Tiles 2 by 8 and a brick lay Arctic White tile.
2:52What do you think?
2:53It.
2:53With these knobs you currently have, and you'll notice all throughout the kitchen, when you go to open it, you typically open it like this. So, you're constantly scratching this area. Now, with brand new painted cabinets, if you had these type of knobs, you're going to end up scratching the paint. You're going to constantly be touching them up. Updating to this handle right here gives you so much more play to actually get your hands in, open it up without scratching any of the cabinets.
3:21That outlet shouldn't be there.
3:25It's kind of odd, isn't it?
3:26It is. They drilled a hole through it. It should have been placed up here, and there's no outlet. So, what we can do is we can have the electrician move the actual box, cut a hole for it. That way the hole comes directly up from the bottom, and it plugs in up top. All right, guys. So, we are all set. As you can see, all of our crews are already hard at work.
3:50A lot to get accomplished in a short amount of time. I don't want you guys to stress about anything.
3:57Okay.
3:57You guys take off for the next couple of days. We're going to see you Wednesday morning, 9:00 a.m. for the final reveal.
4:03That's so cool. I'm so excited.
4:05Awesome. Awesome.
4:07Thank you so much.
4:08I will see you guys shortly, okay?
4:10Bye.
4:11Take care.
4:18All right, guys. It looks like all of our crews are here. We've got about six teams ready to rock and roll. We're going to get them inside, introduce them to the property, show them everything that they need so we can get started right away. My Kitchen Pros Extreme 48-Hour Kitchen Makeover Edition. Let's go. We've got Tri Homes Inc. We've got J. Stanfield Electric. We've got Carlo Acosta doing the tile, and we've got Household 360 doing the plumbing.
4:49And it looks like we've already broken something, guys. It's going to be chaotic. Tim and his crew, they're going to get the plumbing shut off. With Stanfield Electric, we actually have a minor change that we need to make. Homeowners want to update the outlets as well now. And then over here in this cabinet beside the microwave, they put the receptacle for the actual microwave. Let's go ahead and put it above the microwave.
5:13And also, it looks like one of the plugs was burnt out. Had a little fire damage. Awesome. So, we got the cabinet guys getting ready to do the demo. We've got the plumber already disconnected the plumbing. We've got electrician starting on what they need as well. And then we got to figure out what we're going to do for that tile flooring.
5:34That is the challenging part, guys. Cabinets, countertops, tile backsplash, plumbing, electrical, that's the easy part. What we have to do is fix that tile flooring and make it perfect. And we've got less than 48 hours to do so.
6:33We're here at Blue Valley Cabinets with Michael, and today we're going to be talking about some of their awesome products, getting into the different color aspects as well.
6:41Yeah, good to see you again, Travis.
6:43Thank you. Thank you. And again, we can't thank you guys enough for being a part of this project we're doing, the 48-hour extreme makeover challenge.
6:52Yeah.
6:52Kitchen edition. I'd love to talk about your premier paint program.
6:57Sure.
6:58Most homeowners think that typically an RTA cabinet, they're stuck just with specific colors. But what do you guys offer?
7:06Yeah, so we of course have our stock RTA offering, which is about eight or nine different colors that we have at a any given point in time. But we also have a premier paint program that's done in-house in our warehouse. It's not something that we ship out to anybody else. It's something that we own from start to finish. That's available really in any of the products from Benjamin Moore or Sherwin-Williams, any of their paint finishes.
7:26If a customer has that request that they want to see how that would look in their kitchen, or if that's the route that they want to go, they can pursue that, and it gives them a little bit more of that custom finish, maybe without the extended lead time that custom has, or some of that really hefty cost that custom provides typically. Here's just a couple of examples we've got a wall that we have in our showroom that has all the different ones we've done in the past, whether it's samples or full projects.
7:50But here's just a couple examples of them that we like to show. But yeah, we really are proud of the product. We try to keep the lead time between 8 to 12 weeks, so not nearly the 4 or 5 month lead times that some other people might have.
8:01That is awesome to hear, and again, I know my clients have always been super thrilled. Cabinets are going in today. You guys should be delivering around 12.
8:10Yep.
8:10And we have to start the fabrication on the countertops cuz they have to go in tomorrow.
8:14Appreciate it.
8:15Absolutely. Yeah, really excited to see the final product.
8:49All right. Well, Michael, thank you for getting out here, getting this done in such a fast time frame. I know the average typically a week and a half to 2 weeks.
8:58Right.
8:59But again, you guys are really coming through. The homeowners are super excited. As you've seen, we got all of these crews out here already, and you're that final piece of the puzzle.
9:10Yeah, I mean, I'm honestly I'm I'm glad we were able to squeeze it in. I'm not really sure that we, you know, could ever do this on a normal basis, but I'm glad we're able to fit it in in the timeline that works with you guys. So, really just happy to make your customer happy.
9:21Awesome. Thanks again, Michael.
9:22Yes, sir. Thank you, Travis.
9:48Oh, man. It is looking so good. But, we're less than 24 hours away, guys. So, a lot to get done. Still got cabinets that need to get finished, toe kick, quarter round, tile backsplash. We've got to get all of the electrical finished. The rough ins already been completed, which is great. Now, we just have to do the final. We got to get all the under cabinet lighting hung as well.
10:17Plumber needs to get in and reconnect everything. Touch ups, microwave needs to get hung as well. So, a lot to get done. Less than 24 hours away from completing the project. Are we going to finish on time? I don't know. Comment down below and stay tuned to find out. Yeah, so that right there is just siliconing this not a problem. But, but it's once we get to here.
10:46What else?
10:47It's just going to be too much silicone and too noticeable. What size do we need to make this?
10:53You think that the best solution is is is put a panel for my quarters. I seal it that big one. And it would solve that.
11:02A 3/8 panel.
11:04Which means I have to take all this down.
11:07If I do a 3 8s panel, I have to demo this entire thing and do the panel.
11:19And that's going to work you back.
11:21I mean, can we get it done?
11:23What's good?
11:24Sure.
11:25You mean I think you are.
11:28Cabinet cabinet guy is coming back to do this tomorrow morning. But, he he only has an hour to get the crown, to get the toe kicks, to do the quarter round, and do the touch-up. So, now imagine demoing this entire section. But, I can't live with that. So, I'm going to have you explain it to the cabinet guy. That's not going to work, either. Because you see how we have the filler again?
11:59And here the.
12:00Right? This panel doesn't line up with that filler. So, I have to recut this piece. Or or could we make a template, and I could take it to the fabrication shop?
12:13Okay.
12:14And then have them cut the piece. I can bring the piece back, put it on, and silicone it tomorrow morning.
12:18Okay.
12:19We've got cardboard. Let's make a template. I'll have them cut it. I'll bring it tomorrow. We'll get it reinstalled with the new piece.
12:25Okay.
12:28Tiles going in today, too. That's okay.
12:32Just hold them to the side.
12:33Not to silicone.
12:34No, It's only here.
12:37Not to silicone, and I can have a guy here silicone it tomorrow morning.
12:40Oops.
12:41Okay. All right, we'll get it done. Maybe we're cooking. Maybe we do a piece here.
12:49Mhm.
12:52And we do a piece here.
12:56All the same color, and it will all look like one piece.
12:58Right. And then that way, it gives it that it gives it a boxed-in design look. So, I think this is what we can do. We can scribe this entire section right here. So, all the way down, all the way down to here to match this top piece as well. And that and that That's all fine. That should be taken care of. True. Oh, you know what? I wonder if we're going to be able to get that out.
13:38Nope. And because it's recessed and everything like that. Hey, can we can we pull that out? Just make sure it comes out.
13:46The dishwasher?
13:47I'm sure it does. Yeah, okay. Perfect. Sweet. Plumber can take care of that, then. Awesome. Awesome. Sweet deal. Oh my god, that's not going to fit. So, a very common problem when you're swapping out new countertops, and it's nothing to do with the countertops itself, it's usually this right here.
14:23Guys, do you see this? It is perfect with like millimeters to spare.
14:32With the speed key.
14:35Perfect. Woo. Okay, we got lucky there. Having problems like this averted is the best part of my day so far. All right, guys. So, we're here at Lowe's picking up some final products that we need in order to make this project complete. Again, this was not in the scope of work, not something we budgeted for, but it makes all the difference. So, what we're going to do is we're going to be picking up some paint products, some quick dry spackling, and probably also a paintbrush to get this job finished.
15:06We are less than 24 hours away from completing this entire kitchen makeover. So, let's go shopping. We'll do this silicone. So, this silicone right here is going to help prevent mold. It's going to come with a 7-year lifespan warranty for it. So, it's going to be great for kitchen and bathroom areas, especially where there's water. Not that we need it for the water area, cuz we're going to do a different colored silicone that matches our grout.
15:34Guys, so we are all stocked up from Lowe's. We got everything we need to get this final piece of the puzzle done for this project. We're going to have our crews get these touch-ups done. We should be rocking and rolling. We are about 50% complete right now, but less than 20 hours left in the project. So, it's a time crunch, race against the clock, but we should be able to get it done.
15:58Make sure to like and subscribe and follow along to see all of our upcoming content. We're back here at the Lillington project, the 48-hour challenge still underway, less than 24 hours left. We got our amazing tile guy, Carlos, rocking and rolling. Still a ton left to do. We've got our awesome plumbers here getting that rocking and rolling. Couple of things we still have to figure out along the way, but I think we're going to be able to do it in time.
16:22Tiles going in right now. We're doing a beautiful herringbone design instead of that traditional brick lay pattern that you're going to see in most cookie-cutter homes. We just needed to elevate it. Give these clients something that when they walk in 6 months from now, they're still excited about. And I know we're going to hit the mark. All right, so what we got here is a picket tile.
16:46This is not for this project. Tile guy has another job to go to right after this. So, we're always doing projects. Crews are always doing multiple jobs at once. That's the way you have to operate in this industry in order to hit your time frames and your deadlines. All right, guys, so I'm getting ready to wrap up and leave this project for now. We'll be back tomorrow.
17:03We've got to go pick up more supplies, more product. Got to make sure the electrician gets out here, plumber gets done, tile guy gets done. We also got some painting and some touch-up to do along the way. So, again, under 24 hours left. Not sure if we're going to complete it in time, but we're going to try our best. So, stay tuned, follow along, and make sure to check out all of our amazing content.
17:38Let's go ahead and take a look inside, see what we got. Our crews are diligently working to pull this off in time. Lyman's over here busting out the cabinetry. We've already got the tile fully done, the electrical fully done. Now, we just have to finish this cabinetry, get everything put back and cleaned. It is 8:30 on the dot. Got 29 minutes to get all of this done.
18:02Stay tuned, like, subscribe, share, and make sure heart our videos. We'll produce more and better content for you guys in the future if you do. Thanks.
18:22What's the real problem? We were supposed to This was supposed to be 21 in. It was supposed to be 21 It was supposed to have a filler, a 3-in filler.
18:31Yeah.
18:31And then 18-in cabinet.
18:34Yeah. 3 in there.
18:36Oh, okay. Got you. It'll stick over way too much. Okay, cool.
18:47Minutes to spare, we're putting on the final touches right now, just touching everything up on the cabinet side. We got the tile we ended up replacing for the homeowners corrected, fixed, grouted, and looks amazing. We've got all the countertops installed. The beautiful backsplash is complete. All the appliances are hooked back up. We got the new dishwasher installed for them. We upgraded the sink from a regular sink to a Mazi zero radius with accessories.
19:16It's going to come with a cutting board, a drying rack, a utensil/strainer, and a sink great insert. Super excited completing this on time. Super happy. I know the clients are going to be thrilled. I know they're going to love the work that was done here in 48 hours. So, stay tuned cuz we're getting ready to do the final reveal.
19:58Hey guys, we're back at the Lillington project 48 hour extreme makeover kitchen edition. And as you can see, we are done. It is over, finished, everything completed. Cabinets, countertops, backsplash, plumbing, additional electrical that was added last minute the day of the project. We went ahead and changed out all the outlets. The builder had a wire from here underneath the cabinet underneath the countertop connecting to this one.
20:30Definitely not past code at all. We got that taken care of. We got the brand new dishwasher installed. We've got the upgraded sink. We've got the beautiful 9 inch spice rack as well. Guys, I am super thrilled. My team really came through. I want to thank MS International for providing the countertops, Valley Nevada, Blue Valley Cabinets providing the dove and gray shaker style cabinets, Delta for providing the 2 by 8 Arctic white, which we did in a herringbone pattern, and of course all of our amazing subs, Try Homes for the cabinet install, my granite team, my tile team, Household 360 for the plumbing, Jay with Stanfield Electric for the electrical work.
21:19Without all of them, none of this would have been possible. And now it's time to do the reveal with the homeowners and see if they love it or they hate it.
21:33Hey guys, welcome home. Are you guys excited to see your new kitchen?
21:36Oh my gosh, yes. I can't wait.
21:39All right, guys. Tell me what you think.
21:41Oh my gosh.
21:43Wow.
21:44Wow.
21:45I know, and in 48 hours, too.
21:48I can't believe it. I mean, I trusted you.
21:50Much brighter.
21:51It is so much brighter. And we're going to get in and tell you what we've done. So, as you can see, we've actually made some changes from the original plan, and I think the most noticeable one is standing out right now.
22:04It's beautiful.
22:05Absolutely.
22:06Right here.
22:06Yes.
22:08So, what we originally had was a brick lay tile, but because the countertops are so busy, we felt like we really needed to pull the attention away. So, what we did is a 2 by 8 Arctic White from Daltile, but we changed the design and we did it in a herringbone pattern.
22:25It's beautiful. So artistic. It It really is a work of art.
22:30Thank you. Thank you. Our tile guy is fantastic. Carlos, amazing.
22:35So, originally we had you plan for just a regular single bowl rounded sink. Mazzi, our provider, came through and upgraded you guys to the Mazzi zero radius with accessories.
22:46This is going to come with a cutting board, drying rack. My favorite feature is the utensil/strainer. You can put all your utensils in there, so you're not scratching up the actual stainless steel, and then on top of that, you're not cutting yourself reaching for a knife, but it also acts as a strainer. So, when you're prepping vegetables, you can slide it right from the cutting board in, rinse it, strain, all in one.
23:10That's amazing.
23:11Also, we have a sink great down in the bottom. I love to leave that in year-round. I like to put my plates and cups on. Brand new beautiful stainless steel sink like this, the last thing we want to do is scratch the bottom up. So, again, you can leave that in year-round, you can soak, you can do everything you need while that's in place.
23:32It's amazing. And thank you for the upgrade. It's beautiful.
23:35We've got your brand new dishwasher installed. We've got the sink faucet combo all installed. Obviously, we went with the beautiful brushed nickel and the handles as well. I want to catch your attention down here. So, we upgraded the plate.
23:52Oh.
23:52To not only match the brushed nickel, but to match the existing one you already had previously installed.
24:00Is awesome.
24:01I love attention to detail.
24:04Thank you. Absolutely. It really does go a long way and it matters when you're doing a project like this. Even from the smallest things, like the touch-ups, they all play a huge part in making everything look the way it needs to.
24:18And I am a detail person, so I appreciate it as well. It's It is amazing.
24:22Now, I have one final upgrade. So, Jay with Stanfield Electric, he's a local electrician and he does all of our electrical work. When he found out about this 48-hour challenge, he immediately called me, said, "Travis, I want to be a part of it." I said, "Jay, we've got no electrical." So, he said, "Let me do something for these homeowners." So, I've got a really big surprise. Now, when we came here to do the project that morning, you added on the electrical outlets.
24:54Luckily, my electrician was here because he was doing a $3,000 upgrade completely free of charge for you guys.
25:01What? Oh my.
25:03Yes. So if you would do me the honor and flip that bottom switch.
25:08This one?
25:09Yep. Yes.
25:13Oh my gosh, how beautiful.
25:16So Stanfield Electric came in and gave you LED under cabinet lights valued at over $3,000 completely free of charge.
25:25Oh my gosh.
25:25All the way around your cabinetry.
25:28Oh, that is amazing. I'm getting cold chills.
25:31It's so beautiful.
25:33Now these are low voltage wires. They wired them in directly so it's fit to that outlet. But what you're going to notice and this is always super important when doing electrical work, you're not going to have any dimming of your other lights or appliances or breaker switches breaking all the time because they're on their own separate system.
25:52Oh, that is awesome.
25:54Absolutely. So again.
25:56I I really in awe.
25:57And it puts a lot of light in the corners.
25:59Exactly. Yep.
26:01It's beautiful. I feel like I need to just send them a thank you note.
26:06I might do it.
26:07And then of course as always we like to always provide our clients with a gift. So over here in the corner we have this beautiful display case piece. It's going to come with your stainless steel cleaner for your appliances. It's going to come with your everyday grout stone countertop cleaner and disinfectant with a citrus scent so it smells amazing and you can use it every single day on your countertops.
26:30And of course every home needs a Scrub Mommy or Scrub Daddy. The big final question, do you love it or hate it?
26:40I love it. It's amazing. Thank you so much.
26:44Yes ma'am. Of course, it was my pleasure. I really appreciate you guys allowing us to come in and do this project. Most homeowners would say no to a 48-hour challenge. It is difficult to pull off. It is stressful as well. And again, we are so thankful that you guys said yes.
27:02Oh, we're thankful we said yes, too.
27:04Luckily, we pulled it off in time and I'm thrilled that we could help you guys with this kitchen.
27:09Oh, we are too. Thank you so much. It's beyond whatever thought I could have, you know, that I had that it would I can't even I'm speechless. But it is beyond my wildest dreams.
27:20Well, thank you so much. We appreciate it. Now, we're going to get out and we're going to let you enjoy your beautiful new kitchen.
27:25Oh, I can't wait.
28:00All right, guys. That is a wrap. Our 48-hour challenge is done. If you want to be featured on the next one, make sure that you go to our website, fill out the form. One of our amazing team members will get in touch with you. And maybe you could be featured on our next 48-hour extreme makeover kitchen edition.
More from the series
Want your kitchen in the next one?
If you would like your kitchen featured in a future episode, fill out the application and our team will be in touch.